Building the absorber
Watch the building of the absorber for the Drell-Yan measurement at COMPASS. The Torino INFN group assembled it in November 2013 - January 2014 in the INFN workshop in Torino.
Resources for the Drell-Yan project at COMPASS
Watch the building of the absorber for the Drell-Yan measurement at COMPASS. The Torino INFN group assembled it in November 2013 - January 2014 in the INFN workshop in Torino.