9.00 | Introductory remarks (S.Paul) 15'
Report of technical coordinator ((G.Mallot) 20' |
9.40 - 11.10 | SAT:
Preliminary results from Y2K run (Y.Bedfer) 20' Objectives for the year 2001 (A.Magnon) 20' Scintillating fibre progress report (R.Ziegler) 15' Status of Silicon Detectors (M.Wiesmann) 20' |
11.10 - 11.30 | Coffee break |
11.30 - 13.30 | Status of GEM-detectors (J.Friedrich) 20'
LAT: Status of the LAT project (R.Geyer) 20' Status of Dubna production of straws (V.Peshekhonov) 20' Status of MWPC electronics (A.Maggiora) 15' Status of MWPC (O.Denisov) 20' |
13.30 - 14.30 | Lunch |
14.30 - 16.00 | RICH:
Photon detectors (F.Tessarotto) 10' RICH read-out (A.Cicuttin) 10' Radiator gas (S.Dalla Torre) 10' Planning for 2001 (S.Dalla Torre) 20' Muon Walls: Status report on MW1 (G.Alexeev) 15' Status of MW2 (N.N.) 10' |
16.00 - 16.30 | Coffee break |
16.30 | Group Leaders meeting |
9.00 | Report from the G-L meeting (S.Paul) 10' |
9.15 - 11.00 | Polarized target:
Status of the polarized target (J.Koivuniemi) 20' Status of the 6LiD (A.Meier) 20' Calorimetry: Status report HCAL2/ECAL2 (V.Poliakov) 20' Status report HCAL1 (O.Gavrichtouk) 15' |
10.40 - 11.00 | Coffee break |
11.00 - 13.00 | Slow Control:
Slow Control Status report (V.Sougoniaev) 15' Trigger: Primakoff Trigger (A.Olchevski) 20' Status of the Muon Trigger (D.v.Harrach) 20' t.b.c. Off-line: Some tracking with real data (S.Gerassimov) 10' Progress in pattern recognition (K.Kurek) 10' General status (J.-M. Le Goff) 15' |
13.00 - 14.30 | Lunch |
14.30 | Front-End and DAQ:
Status and discussion of front-end (I.Konorov) 25'+10' Performance of DAQ (N.N.) 15' Concluding remarks (F.Bradamante) |
17.00 | End of the meeting |