Week (04/08 - 11/08) report by Yu.Khokhlov. I. During the 1-st period of the week (04/08 16:00 -- 08/08 11:30) - that w/o beam - some activities were going on, among them: - DAQ rate bottleneck & Network problem investigation - MM setting up - ECAL1 commissioning (incl. SADC RO). - Monitoring (cool, MTV) - DCS fixing/improvements - Straw FE fixing/scanning - SciFiW "fixing" - ........... - Target polarization build-up Solenoid quench happened (Monday ~17:00) while attempting to improve the field homogeneity. II. 08/08 the period w. beam started from the first run 49216 (11:30). During this period 2-nd quench happened (Tuesday 20:40). Out of 75 h of the 2-nd period: 1) ~24 h no beam. 2) ~43 h "well defined" (documented) beam usage, namely: - "First-order" survey of detectors, some fixing (~4h) OK - To get all equipment in DAQ (~ 8h) OK, very few pbs. persists - Trigger delay scan (~3h) OK - HCAL2 timing scan (~1h) OK - MM (new setup) eff. scan @ 1T (4h) OK, to be analyzed - APV latency scan (~5 h) OK - SciFi thr. scan (~8h ) OK, to be finished - HCAL1 calib (~5h) OK. To be refined. - Alignment,SM1&SM2 fields ON-OFF, 1T (~2h) OK - Beam line tuning for Far Halo reduction (~1h) OK, down by ~50% - RICH PMT thr. tuning - in progress at the time of the meeting, ~ 2 h 3) ~8 h "unidentified" - e.g. rebootng/reloading/restarting DAQ staff etc. Still to do: SciFiJ thr. scan ECAL2 calib. w. electrons -- Big enterprise HCAL1 calib. - periphery exposition Alignment - to be repeated ? (GEM02 moved) III. Detectors/systems status at the end of the week. Target: OK, solenoid hardware RO problem software-protected. Now @2.5 T, polarizing @ ~40%. Trigger/Veto: OK but 1 S-link. RICH: OK but DCS control (no spare PS module for IT/CO) BMS: OK SciFi D/J/W OK but 16 channels Si OK GEM OK but CAEN <--> DCS connection. MM OK DC OK MWPC OK W45 OK but 1 port of RO MW1,2 OK RW OK Straws OK HCAL1 OK HCAL2 OK ECAL2 OK but lack of ADCs. Either to repair (4) FIADCs, or to install SADCs. ECAL1 work ongoing (LED system, channels fixing); not ready for calibration DAQ OK but MTV/decoding update and filter problem DCS: OK but RICH & GEM (supra) Shifts: instructions update is needed, trace-plots temporary replacement, better log-booking. Monitoring: -- Booky OK but reference -- E-logbook COOL & MTV OK. No Tape & BeamLine info.Wrong target info. -- Screen trace plots No scalers, no beam line, no beam position.