|
08-APR-1999:
Turned target platform with dummy weight.
(JM Demolis (left) and Y Andrès)
|
|
08-APR-1999:
SM2 and parts of SM1.
|
|
18-MAR-1999:
SM2 on support, rails.
|
|
18-MAR-1999:
SM2 downstream side.
|
|
18-MAR-1999:
SM2 upstream side.
|
|
18-MAR-1999:
View from target loading platform upward the beam line.
The yellow frame allows lateral adjustment of the last quadrupoles during
transverse target polarisation.
|
|
18-MAR-1999:
Polarised target platform, ready to receive Oxford magnet! (well, almost)
|
|
18-MAR-1999:
Polarised target platform.
|
|
18-MAR-1999:
Polarised target platform.
|
|
04-FEB-1999:
Assembly of the SM2 chariot.
|
|
04-FEB-1999:
Assembly of the SM2 chariot.
|
|
04-FEB-1999:
Assembly of the polarized target chariot (Yves Andres (left)and Jean-Marc Demolis).
|
|
04-FEB-1999:
Assembly of the turnable polarized target chariot.
|
|
04-FEB-1999:
The new pump hut.
|
|
04-FEB-1999:
He-3 storage in the new pump hut.
|
|
04-FEB-1999:
HCAL1: Changing the wave length shifters and scintillators.
|
|
04-FEB-1999:
HCAL1: Changing the wave length shifters and scintillators (Oleg Gavrichtchouk)
|
|
04-FEB-1999:
HCAL1: Changing the scintillators.
|