| Pushing it with a forklift
(downsteam side).
|
| Pulling the cable with the crane.
The cable was redirected upward
by a wheel mounted on concrete
and iron blocks (upsteam side).
|
| Now it's stretched.
|
| Here you see some of
the air pad control device.
|
| Yes! These small air pads do it all.
|
| The crew
|
| In full action.
The person in green is pulling
the airpad control device
in order to follow the 420 t magnet.
|
| Keeping 420 tons on track.
|
| Final location with removed
target platform (13-AUG-1998)
|