Period | beam | priorities | remarks | ||
---|---|---|---|---|---|
| |||||
May 25 | - | May 30 | muons | beam setup | |
May 30 | MD, electrons | electron beam test | (L. Gatignon, S. Donskov, A. Olchevski) | ||
| |||||
May 31 | - | June 7 | muons | MWPC tests | (O. Denisov) |
electron beam test vs. MWPC tests | |||||
(to be confirmed) | |||||
June 7 | MD | ||||
| |||||
June 7 | - | June 19 | muons | muon trigger studies | (June 10 - June 19) |
| |||||
June 19 | - | June 23 | no beam | installations | area open |
| |||||
June 23 | - | July 5 | electrons | 1 week ECAL calibration | |
1 week hadron beam tests with | (S. Donskov, A. Olchevski) | ||||
ECAL and target veto | |||||
June 28 | , | July 5 | MD | ||
| |||||
July 5 | - | July 31 | muons | ||
July 12 | MD | SPS energy change | from 450 GeV to 400 GeV | ||
July 19 | - | July 20 | MD | ||
July 26 | MD | ||||
| |||||
July 31 | - | August 4 | no beam | installations | area open |
| |||||
August 4 | - | September 4 | muons | 2 weeks muon trigger studies | (F. Klein, D. v. Harrach) |
with MWPC-B equipped | |||||
2 weeks RICH studies | (S. dalla Torre) | ||||
with MWPC-A equipped | |||||
| |||||
September 4 | - | September 9 | muons | low-rate only | |
| |||||