Next:
REFEREES' QUESTIONS
Up:
Common Muon and
Previous:
THE COMPASS COLLABORATION
Contents
REFEREES' QUESTIONS
QUESTIONS ON PHYSICS
QUESTIONS ON THE EXPERIMENTAL SETUP
ANSWERS TO THE QUESTIONS ON PHYSICS
Delta G / G
Measurement of Delta G / G in COMPASS
Measurement of Delta G / G at RHIC
PHYSICS WITH CHARMED HADRONS
Charm production studies
Doubly charmed baryons
Semileptonic charmed baryon decays
Leptonic decays
Discoveries
What to do with 10 million reconstructed charmed hadrons?
Comments on Hera-B
PHYSICS WITH PRIMAKOFF REACTIONS AND THE pi(1800)
Search for the strange partner of the pi(1800)
Primakoff vs. diffractive production
pi(1800) by Primakoff production
The channel pi(1800) to omega pi pi
ANSWERS TO THE QUESTIONS ON THE EXPERIMENTAL SETUP
MUON TARGET AND MAGNET
Construction schedule
Cost Estimate
Responsibilities and Manpower
TRACKING CHAMBERS
Chamber description and performance evaluation
Details on alignment and calibration
Prototype testing
Manpower for construction and operation
RICH
Radiator vessel
Mirrors
Gas radiator system
Photon detectors
Comments on the possibility of replacing RICH1 with threshold Cherenkovs
Funding
MUON WALL DETECTORS
Physics requirements
Choice of detectors
ELECTROMAGNETIC CALORIMETERS
SILICON DETECTORS
Signal to noise ratio
Readout frequency
Radiation damage
Conclusion
DATA ACQUISITION
Schedule for the design and tests of the DAQ
DAQ programs
Real-Time operating systems
Support by CERN
OFFLINE COMPUTING
COMPASS Data Rates to Tape
Calibration
Offline Computing and Data Reconstruction
DST Analysis
Cost Estimates
References
About this document ...
Lars Schmitt
Wed May 22 16:44:09 METDST 1996