Minutes from target meeting held February 27 2015 in 892-1-D20 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2015/ a) Pressurize mixing chamber to 870 mbar with helium gas. This should prevent air from leaking via the gate valve when the helium-3 roots pump vacuum is broken. b) On Wednesday try to install helium-3 roots pump WKP4000 internal heat exchanger. The top part of the heat exchanger is touching the wall of an opening at the last 10 - 13 mm. The width of this opening is less than the 180 mm in the original heat exchanger drawings. c) The new pump oil P3 from Pfeiffer was received on Wednesday. d) Norihiro: switch from LN2 cooling to LHe cooling on Monday. Pump LN2 cooling loop inside magnet to 10^-3 mbar. On Wednesday 50 - 60 K reached. On Thursday morning the magnet temperature had reached 4 K and system is ready for filling in LHe. At the same time filling of the LHe buffer dewar on the target platform was going on. e) Magnet electric safety inspection took place on Friday.