Minutes from target meeting held September 25 2015 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2015/ a) PSTP2015 took place at Bochum September 14 - 18 2015. See http://www.ep1.rub.de/PSTP2015/ b) Planning after run was discussed. The beam stops on Monday November 16 at 8:00. Target unloading is planned on November 18 with empty target cell calibration November 20 - 24. After this the target holder is removed and system is warmed up slowly to room temperature. c) Fabrice: magnet power converter upgrade took place on Tuesday morning. Magnet was ramped down to zero current. d) Ramp up solenoid on Tuesday noon to 2.5 T field. Start to build up polarization. Continue until Wednesday afternoon. Ramp up transverse dipole field to 0.6 T. e) Yuri: change upstream EIO microwave generator water cooling tube. f) AVS47-1 GPIB box seems to be dead. Thus no readings for thermometers TDR1, TDR2, TDR5, TDR7, TPR7 nor TPR8.