Minutes from target meeting held January 16 2015 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2015/ a) Start to pump out gas from mixing chamber on Monday afternoon until Wednesday. The still pressure PV8 shows removal of water ice and possibly ammonia ice. The access tube temperature was about 248 K. Fill in 2 mbar of Argon heat exchange gas to isolation vacuum to speed up the warming. b) Open target holder Kevlar tube and extract target cells from it. c) Kaori: re-open cooling water to the control room. Test microwave power supply in standby mode. Check NMR coils solderings and mechanical fixing of coils on target cells.