Minutes from target meeting held October 31 2014 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Replace electrolyte capacitors in resistance bridge AVS46-UP with new ones. The circuit board trace damaged in two places during removal of the capacitors. These were repaired with a wire. b) On Wednesday move dilution cryostat top flange self regulating heater cable lower to warm up the flange o-ring more efficiently. c) On Thursday morning start helium-4 evaporator pumps. Fill evaporator with liquid helium. Nominal temperature around 1.2 K reached. Continue pumping evaporator until Friday afternoon. Start all the helium-3 roots blowers on Thursday afternoon and run until Friday afternoon. Pumping small amount of helium-4 gas in the mixing chamber. d) Kaori: prepare DIM server with LabVIEW to publish coil polarization. e) Fabrice: fill magnet with liquid helium. 800 mm in the differential pressure level gauge LE0003 is the full status. The superconducting filament level gauge LE0001 is not operational. In the "D/S Turret Heaters" display box the low and high limits are mixed up. Electrical safety visit took place on the magnet control system. f) Johannes: target loading platform and MIV1000/2100 roots pump system being prepared for the removal of the empty target cells and loading of the target material. This operation needs about 400 l of liquid nitrogen or two 200 l dewars.