Minutes from target meeting held February 21 2014 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Jaakko: Write correct installation script for 'ptread', see https://git.cern.ch/web/ptread.git . A new DIM server written in C++ available from Jan. This version allows use of a separate configuration file that was not possible with the original C version of the program. b) The helium-3 roots water cooled heat exchanger cover plates were received from Pfeiffer. The o-ring for the water was placed outside of the holes for fixing screws. Now this manufacturing error has been corrected. c) Fabrice: magnet is kept cold and waiting for the magnet safety system delivery. The cabling is going on. Field mapping bench already put in place. d) Liquid helium is expected to be available from middle of July. e) Norihiro: additional Profibus adapter needed for the new servo motor controls. f) Kaori: CPI confirmed the inverter fault in the microwave power supply. The probable reason was a third party module with bad connection in one chip. A stress test is going to be done at CPI before sending the power supply back to CERN.