Minutes from target meeting held February 14 2014 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Jaakko: Update Siemens PLC drawings. The substation in the pump room has many new modules for reading the helium-3 roots motor temperatures. The digital inputs that were originally used to monitor the operation state of helium-4 pumps are not needed any more due to pump upgrade. The control room substation has two new unused modules. The target platform has unused modules that were used for automatization of LN2 precooling of the magnet in 2004. b) Calculate the target material data of run 2006 since this was missing from the elog notes. See http://wwwcompass.cern.ch/elog/target_polar/197 c) Kaori from Gerhard: irradiation tests of the Q-meter modules did not reveal any change in the NMR circuit operation. The dose was 100 Gy. New Q-meter modules could be tested during the thermal equilibrium calibration before the physics run 2014. Quote received for 150 feet of miniature coax cable UT034 to be used in the target holder. The model B not available and the standard cable has silver plated copper clad-steel inner conductor (SPCW). This might influence the magnetoresistive behavior of the NMR circuit.