Minutes from target meeting held April 11 2014 in 892-2-002 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Fabrice: Magnet position on the target platform checked within +-1 mm. The thermal screen suspensions inside the vacuum vessel modified since 2011 and the aluminium screens between the dilution cryostat and magnet need a small modification. The PTFE support under the glassfiber ring fixed on the cavity needs to be modified too. Now only short section of the ring on the bottom of the magnet bore is going to be used. This circular support can be put in place with long aluminium rods from the downstream end of the magnet after inserting the dilution cryostat into the magnet. b) Meeting at CERN central workshop on Monday morning to discuss new target holder parts. Cost estimate being prepared. c) Kaori: test CPI power supply on Monday. Instead of EIO tube microwave generator a dummy load resistor was installed into the high voltage connection box to simulate the heater filament. Normal operation without error messages from the CPI power supply. Reconnect EIO tube and test the tube oscillation on Wednesday. Frequency control is working too. Then a long time test in standby mode of the power supply. d) Norihiro: test new servomotors for the control of needle valves. e) Magnet operational parameters can be communicated to the DCS system using DIP server. f) Prepare dilution cryostat for insertion into the magnet. The cavity cooling loop closed with copper seals and downstream thermometer glued on the cavity surface. Install outer support ring made of glassfiber. Remove old vacuum gauges that are going to be replaced with new ones. g) Target control room temperature at +28 - +30 C due to missing cooling water for the air conditioning unit.