Minutes from target meeting held August 8 2014 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Solder connectors to the pressure gauge extension cables and connect them to the pressure displays. Pull the thermometer cables and connect to the dilution cryostat. The diode thermometers were tested except the target plug thermometer. The connection panel for pt100 thermometers and ELMB are in different racks now at 8 meter distance from each other. b) Johannes: magnet cabling almost finished. The second connection rack for dipole power cables done. Signal cables to be pulled from the Jura side patch panel. c) Norihiro: broken diffusion pump pressure display replaced. Pump vacuum and helium leak test diffusion pump system after remounting. d) Norihiro: test needle valve motors. The remote control can be done with 0 - 10 V. One of the motor driver boards half broken and does not allow remote control. e) Kaori: testing of the ADC board for NMR finished. UT-034 coax cable for the target holder received.