Minutes from target meeting held April 4 2014 in 892-1-D20 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2014/ a) Remove unused cables from the pressure display rack and install six serial cables with four USB to serial converters for the pressure displays. The PDISPLAY1 to PDISPLAY5 can now be read from the PC. Two bad serial cables had to be repaired. Switch on the AVS46-1, AVS46-3, AVS46-DWN, AVS46-UP, AVS47-1 and AVS47-2 and start collecting data from all the available channels. b) On Thursday morning move the target magnet from 180 to 888 and install it on the target platform. On Thursday afternoon move dilution cryostat from the clean area to the second door in the experimental hall 888. The dilution cryostat counterweight was set to 40 cm distance from the upstream flange and four lead bricks were used. Photos available from \\cern.ch\dfs\Experiments\Compass\PT_data\Photos\Jaakko\2014_04_03 On Friday afternoon insert target holder into the mixing chamber to test mechanical functionality of target loading. c) Planning for the magnet installation was discussed. Fabrice: the big magnet safety valves need to be checked at CERN. d) Kaori: microwave power supply filament test load resistor received from the CPI. e) Jan: produce dilution cryostat diagram for the DCS display.