Minutes from target meeting held October 25 2013 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2013/ a) Remount Pfeiffer water cooled heat exchanger after the last roots blower on Monday. The water connections were done on Thursday morning. On Thursday afternoon make a short test of about one hour with the pumps running empty after the air had been removed. Temperature drop of about 13 C was measured for the rebuild heat exchanger. At the same time temperature drop of 12 C was measured from a similar but original heat exchanger. On Friday morning unmount three other similar heat exchangers. These were given to Pfeiffer for rebuilding. b) Install SLC6 and linux-gpib-3.2.18 to an old PC in the target control room. Start testing the 'ptread' daemon to read the resistance bridges and pressure displays in the control room. See the setup file for the planned Drell-Yan configuration https://git.cern.ch/web/ptread.git/blob/HEAD:/setup/DrellYan/na58target2dcs.txt c) Kaori: test CPI microwave power supply during the week. The system is operational with the inverter fault alarm. d) Target loading platform modifications were discussed. e) Norihiro: needle valve control system with Mitsubishi PLC under development at Yamagata. This will use a normal motor instead of the ultrasonic one that was originally planned.