Minutes from target meeting held February 1 2013 in 892-1- These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2013/ a) Send AVS47-IB resistance bridge picobus/GPIB interface to repair. b) Kaori: delay in the EIO microwave generator tube matching test at CPI due to unexpected problems with the power supply. c) Jaakko: communicate the performance description of the Pfeiffer helium-3 roots blowers to Pfeiffer subcontractor http://wwwcompass.cern.ch/twiki/pub/PolarizedTarget/PolTargPump/pfeiffer15442784.pdf Also summarize the typical water pressure, flow, helium-3 flow and pressure to the Pfeiffer subcontractor. These are the values that were used 2001 - 2011, see for example http://wwwcompass.cern.ch/elog/target_polar/111 In the run 2011 low pressure water at about 0.5 - 1 bar abs was used.