Minutes from target meeting held September 6 2013 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2013/ a) Norihiro: Microwave table was reinstalled in new Drell-Yan position on Tuesday. This is about 2 meters upstream from the 2011 position. The rack from the Saleve side wall for controlling the EIO tube servomotors and frequency modulation was installed next to the microwave table. The microwave power supplies will be installed into the same rack. The microwave feeding hole diameter through the concrete wall is a little different from the previous position so the metallic tubes going into this hole need to be adapted. b) Yuri: work on the microwave cavity testing finished. The cavity conical end piece transported to CERN workshop for surface treatment/cleaning. The assembly to the cavity expected in two weeks. c) Jaakko: move 'ptread', 'ptnmr' and 'rfindcalc' repositories from CERN subversion to git version control. See https://git.cern.ch/web/ d) Installation work for the magnet and dilution cryostat to the experimental hall in 2014 was discussed.