Minutes from target meeting held October 4 2013 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2013/ a) Alexander produced drawings for the new Drell-Yan target cells made of torlon plastic. See http://wwwcompass.cern.ch/twiki/bin/view/Drell_Yan/DyPtDrawings b) One of the water cooled helium-3 roots blower heat exchangers has been rebuild at Pfeiffer. See http://wwwcompass.cern.ch/elog/target_polar/193 c) The target planning for 2014 was discussed. Some of the important mile stones are the target platform moving to the Drell-Yan position, end of magnet tests at 180 and availability of LHe. d) On Wednesday afternoon installation of the support pillars for the target platform was discussed. To make the installation possible some of the aluminum plates need to be cut. The cable and water hose supporting arm from the Jura side needs to be shortened too. On Thursday afternoon the cables, water pipes and flow meters that are hindering this operation were removed. Also the helium-3 thermometer rack was stored in pump room. e) Norihiro: microwave guides can be re-installed and tested when the platform is at the new position. The NMR rack will be re-installed below the platform. The PLC substation under the platform can be updated and connected with the Profibus cable to the control room. f) Loading platform modification was discussed. g) Fabrice: diffusion pump needs to be connected to the magnet isolation vacuum port. On the Saleve side of the target platform no racks are going to be installed. On the Jura side three racks: one for the solenoid and dipole contactors, one for the dump resistor and diodes, and one for the cable patch panel. The power cable patch panel is going to under the platform. h) Kaori: offer received for a new EIO tube water cooler about CHF 2700.