Minutes from target meeting held August 2 2013 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2013/ a) On Monday make inventory of helium-3/4 mixture. The relative amount of the two different helium isotopes were determined with quadrupole mass spectrometer. The amount of both isotopes is practically the same like in the inventory done 2009. Small amount of N2 was found from tanks #1 and #9 while the other tanks did not have measurable impurities in the detection scale. b) Yuri: cavity microwave input circuit needs to be partially reconstructed. Measuring the microwave leakage between the two halves of the microwave cavity. The conical cavity end piece is installed now. Use a testing microwave stopper inside the mixing chamber. The central cell microwave feed through will be closed. c) Norihiro: the target control room wall was moved by two meters upstream to make space for the new microwave table position. The water valves and outlets that were on this wall need to be moved to a new position. Small modifications to be done on the rack power cabling, but the "normabarre" will stay as it is. One new rack for the microwave power supplies will be added. The floor needs to be modified for the mounting of the microwave table. The new holes for the microwave guides between the control room and the experimental area are ready. d) Michael: submit abstract to the PSTP 2013 http://faculty.virginia.edu/PSTP2013