Minutes from target meeting held April 27 2012 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2012/ a) On Thursday afternoon meeting with CERN workshop to discuss possible rebuilding of the water cooled heat exchangers for the helium-3 roots blowers. Cost estimate is on the way. b) Modifications to the microwave cavity were discussed. Yuri: the cavity centering inside the magnet could be improved with a new support. The downstream window needs to be opened in the clean area for further investigations. The present cavity is not designed to stand one bar pressure difference between inside and outside. This could happen in case of a catastrophic rupture of the glassfiber expoxy mixing chamber. c) Fabrice: repair of the cooling water manifold in the pump room is going on. The water filter and pressure regulator need to be still replaced and the electropneumatic valve checked. d) Fabrice: the new diffusion pump control system cabling is going on. Connection box made on the target platform for easy disconnection in case of the target platform rotation. e) Kaori: move PXI-crate to office and the NMR cables to the control room. f) Kaori: compare 2010 and 2011 proton background signals from the empty target cells. Maximum 6 % difference for coil #10. g) The systematic error (bias) of the target polarization in the transverse data taking 2010 in 0.63 T dipole field was discussed. Claude: the uncorrelated systematic errors need to be added in quadrature.