Minutes from target meeting held October 26 2012 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2012/ a) Renew pump room door thermal insulation. b) Remote control and monitoring of the polarized target was discussed. One possibility for the GPIB-bus connected devices would be to use an Ethernet GPIB converter. The microwave generator tubes need to be close to the polarized target to minimize the wave guide losses. The servomotors on the microwave table could be controlled remotely from a PC.