Minutes from target meeting held November 2 2012 in 892-1-D20 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2012/ a) List of the instruments that could possibly be read directly by the COMPASS DCS system without LabVIEW in between http://wwwcompass.cern.ch/elog/target_polar/181 b) Fabrice: CERN ICE support proposed two ways to use LabVIEW remotely. First possibility is to use a web interface to the LabVIEW and second is to rewrite the data acquisition software as split server/client application. c) The microwave table has to stay close to the polarized target due to wave guide losses. Possibility to remote control the servo motors was discussed. The other possibility would be to have no beam during the polarization build up in 2.5 T field. This should be possible since the Drell-Yan data is taken in transverse dipole field. Norihiro: using dipole field reversals would make more efficient use of the beam time. d) Yuri: submit Dubna Spin 2012 proceeding paper. e) Fabrice: magnet trim coils have been repaired with the new heaters. The wiring inside has been replaced by LHC type radiation hard wiring.