Minutes from target meeting held September 30 2011 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Tatsuro: stop polarization build up on Friday evening 22:00. Polarizations of -88.1 %, +86.5 % and -86.8 % reached. In frozen spin mode on Tuesday morning fill the check list at 8:00. At 8:54 the roots #4 stopped. The motor protection circuit breaker was reset at 9:18. The mixing chamber heated up during the pump stop and the polarizations dropped to -76.2 %, +70.3 % and -68.5 %. Restart polarizing from 10:30 after field rotation to positive solenoid current. Access was needed to balance the microwave power between the upstream and downstream cells. On Wednesday evening 22:00 polarizations -88.1 %, +86.5 % and -86.8 % reached. Frozen spin mode started. The weight of the LN2 buffer dewar is 285 kg when full. b) Kaori: retune the coil #4 Q-meter on Friday September 30 afternoon. After retuning the polarization measured by this coil shifted by 0.6 %. c) The thermal equilibrium calibration after the run with the target material and empty target cells was discussed. After this some additional time is needed for the magnet tests. The target unloading is planned on Tuesday November 15. Yuri: magnet field map should be measured with all the trim coils off. d) Fabrice: offer received from the ET systems for eight new trim coil power supplies. The old power supplies can not be repaired any more. e) Yuri reported on the PSTP2011 that took place in St.Petersburg Russia September 12 - 16. See http://pstp2011.lkst.ru/ f) Jan told about proton relaxation time measurements of deuterated etanol and butanol done in Prague using 500 MHz pulsed NMR spectrometer. g) Jaakko: frozen spin field maps before and after retuning of the trim coils http://wwwcompass.cern.ch/elog/target_polar/138 h) Jaakko: NMR-peak shift during the polarization build up of September 22 - 23: http://wwwcompass.cern.ch/elog/target_polar/139