Minutes from target meeting held July 29 2011 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Monday 14:00 - 21:00 topping up polarization from +83.6 %, -83.9 % and +85.1 % to +87.2 %, -89.4 % and +88.4 %. Continue to polarize Wednesday 13:30 - 21:00 from +86.5 %, -87.9 % and +87.6 % to +88.4 %, -90.3 % and +89.0 %. Polarize on Thursday 12:00 - 22:00 from +88.4 %, -89.5 % and +89.0 % to +90.2 %, -91.7 % and 90.6 %. All the build ups were done with a positive solenoid current sign. b) Yuri: NMR rack water cooler ran empty Thursday 23:00. The water temperature measured by pt100 increased from +25 C to +28 C and polarization was not measured correctly. Refill the cooler on Friday morning 9:30 and the normal polarization values were recovered. c) A web camera was installed into the target control room to see the alarms from the magnet and dilution cryostat systems. d) Calculate 2.5 T relaxation rates from 2011. Typically loss of 0.3 %/d for up- and downstream, and 0.6 %/d for central cell with negative polarization. See http://wwwcompass.cern.ch/elog/target_polar/123 e) Christian: relaxation times in 2.5 T field 4000 - 11000 h depending on the coil. See http://wwwcompass.cern.ch/elog/target_polar/125 f) The preliminary polarization plot from SPS periods P2 and P3 in http://wwwcompass.cern.ch/elog/target_polar/122 g) The microwave parameters from polarization build up July 10 - 11 http://wwwcompass.cern.ch/elog/target_polar/124 h) Update dcsread utility. See http://compass02.cern.ch/elog/target_polar/126