Minutes from target meeting held June 17 2011 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Most of the magnet thermometers stopped working on Sunday morning 5:30. The problem solved on Tuesday by switching CABTF1 inside the magnet cryogenics rack off and on again. Fabrice: thermometer failure could cause the current lead heaters to switch on permanently. Possibilities to detect this failure are being discussed. b) Condense helium-3/4 mixture on Tuesday. Restart dilution cryostat on Tuesday evening. On Wednesday when still heater switched on large pressure difference between PV8 (still) and P1 (roots inlet). Probable blockage in the internal heat exchangers due to the liquid nitrogen from target loading. Set still heater to 8 V and start to polarize the central cell. About -40 % reached in two hours. Set still heater to 12 V and polarize upstream and downstream cells only. About -30 % reached in two hours. See http://wwwcompass.cern.ch/elog/target_polar/114 c) Stop polarizing at 14:00 and start putting helium-3/4 mixture back to storage tanks. The dilution cryostat empty 21:20. Stop helium-4 evaporator pumps and pressurize the evaporator to atmospheric pressure. The evaporator empty at around 1:00. Mixing chamber warmed up to 41 K by Thursday morning 8:00. The evaporator warmed to 32 K. Analyze circulating residual gas: 7.5 % helium-3, 78.5 % helium-4 and 14 % of nitrogen. Pump the residual gas to tank #9 and fill in helium-4 from bottle. Circulate the gas a few hours and pump out. This repeated a few times. Analyze clean helium-4 sample 21:00. Restart cooling down of the mixing chamber from 58 K and evaporator from 51 K. Friday morning 8:00 evaporator at 10 K and mixing chamber at 53 K. Increase helium flow to mixing chamber to cool down faster. d) Target shift instructions 2011 in wiki http://wwwcompass.cern.ch/twiki/bin/view/PolarizedTarget/PolTargShift In addition to target week coordinator a target on call person can help in more difficult tasks. e) Fabrice: helium-3 roots water drain fixed with pasta. During rain some of the water has leaked out from this connection. f) Norihiro: to use Step 7 for PLC PVSS was installed to PC since it includes the license for Step 7.