Minutes from target meeting held April 15 2011 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Nine Ziehl PTC-resistor relays MSR220K were replaced with new ones in the helium-3 roots control cabinet April 4 - 6. b) On Monday April 4 test first helium-3 roots pump water cooled heat exchanger at 7.15 bar. c) Start target isolation vacuum pumps. The fuse inside the control box with PLC was replaced twice before stable operation could be started. Open cooling water and test diffusion pump. Stop pumping with diffusion pump and connect isolation vacuum to helium leak detector. Spray helium on the vacuum o-rings. No leaks found. Connect gas helium line to the separator and let helium flow through the screen cooling lines and cavity pumping line. Open the needle valves to the helium-4 evaporator. No leak to isolation vacuum seen. d) Problem with target platform power. Knocking on the AUL box switched off all the power. Technical service called to fix the cables inside the AUL distribution box. e) Spare flow spinners for helium-3 roots blowers received from Apollo Flow. f) On Monday April 11 one of the small heat exchangers received as completely water tight and tested. Connect the vacuum volume of the heat exchanger to helium leak detector. Good vacuum reached with low background leak level. A helium leak located to one of the pipe feed throughs with hard soldering. The heat exchanger returned to main workshop for repair. g) On Tuesday April 12 unmount the last heat exchanger from the pump system. Water leak found also from this unit. Thursday afternoon visit CERN central workshop. The possibility to glue the water leaks with Ecobond was discussed. Friday meeting with TE/CRG Johan Bremer to discuss on the heat exchanger repair. h) The roots cooling water inlet pressure was increased with the new water circuit for the run 2010 from 3.3 bar to 5.0 bar. In addition the flow control valve was moved from the inlet to outlet. See http://wwwcompass.cern.ch/elog/target_polar/111 i) Two spare heat exchangers were helium leak tested on Friday. j) Norihiro: order new PLC modules for analog input voltage and current and for temperature. Make longer test on the diffusion pump. The stable outlet water temperature around +38 C. Change new power supply to the PC used to program the PLC. k) Hiroki: install new motor to the microwave attenuator.