Minutes from target meeting held November 11 2011 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Jonas: the isolation vacuum diffusion pump stopped on Friday 11:00. The butterfly valve stuck. Finally opened with a little higher pressure from helium bottle. The diffusion pump stopped again on Sunday 23:45. The still heater interlock from the PLC was bypassed until Monday 8:00 or the end of the beam time. The pump was restarted on Monday afternoon. Field rotations were done both on Saturday and Sunday. b) Norihiro: the LHe transfer valve parameters to the magnet were readjusted for more stable operation (Fabrice). c) Kaori: new ink cassettes received for the Siemens Multireg plotter. d) Fabrice: new diffusion pump control system to be installed in the control room. This may need re-arrangement of microwave power supplies.