Minutes from target meeting held March 11 2011 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Offer for rental LN2 dewar filled with 150 l of liquid nitrogen for 15 days CHF 315. Three days needed for delivery. b) Calculate frozen spin transverse polarization values for each run 2010. The average absolute values of polarizations were 78.9, 79.6 and 79.8 % for 1522 runs and 183037 spills. See http://wwwcompass.cern.ch/elog/target_polar/109 c) Fabrice: helium-4 pump service foreseen next week. New water flow indicators for microwave tubes ordered. d) Yuri: ground metallic false floor plate next to the microwave table. The cooling water tubes to the EIO microwave generators replaced. Repaint aramide tube with Aquadag on the position of the microwave stopper. e) Jaakko: close the false floor behind the racks in the control room.