Minutes from target meeting held February 4 2011 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2011/ a) Reinstall baratron to the helium-3 vapor pressure thermometer rack. b) Collect dilution cryostat over pressure valves for safety check. The helium-3 roots inlet pipe pressurized to atmospheric pressure. c) The dilution cryostat PLC moved from the general purpose network to the technical network to make it accessible from the COMPASS DCS. d) Fabrice: preliminary plan made for the polarized target start 2011. e) Fabrice: replace water pressure reducer in the pump room. A broken pressure gauge replaced. f) Norihiro: new motor for the microwave splitter expected end of April. g) Yuri: possible experiment of the polarization loss from 30 %, 50 % and 75 % to distinguish between the electromagnetic radiation and phonon relaxation. h) Ales: a good summer student candidate available from the Czech for the cryogenics.