Minutes from target meeting held May 28 2010 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Condense helium-3/4 mixture on Tuesday morning. Ramp up the field and start polarizing noon. Thursday +85.5%, +82.5% and +84.4% reached for upstream, central and downstream cells. Fabrice: micropowercut happened Thursday 08:50. Try to save polarization with dipole field but fail. Afternoon 15:00 a slow discharge took place. Start to polarize in negative direction Thursday 16:00 and -74 % reached by Friday 10:00. Werner: last third build up from maximum polarization independent of radical density. b) Remote control of up- and downstream microwave attenuator was discussed. c) Norihiro: calculate figure of merit for run 2010 assuming different periods between microwave reversals. Typical time between SPS machine development stops is 13 days. d) Target week coordination was discussed. Target shifts are more or less filled until beginning of July or August. e) Norihiro: when polarizing only up- and downstream cells very small buildup seen in central cell. Thus microwave leak is small.