Minutes from target meeting held March 26 2010 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Close target holder and leak test at room temperature. Repair leak in helium-3 thermometer pipe. Insert target cells into Kevlar tube. Locate broken wire going to the helium-3 filling tube heater on bottom of the mixing chamber. Connect target cell NMR coils and thermometers to the target holder. b) Kaori: mount PXI-crate on the shelve above microwave guide holes on the concrete wall on Saleve side. Connect PXI cables to the Q-meters and take power from the NMR rack. Connect Q-meters to the NMR coils and check the Q-curve of the NMR circuit. c) Yuri: connect the new microwave PSU to the PLC interlock circuit. Restrict power to the middle cell with an attenuator to below 2 W. Cover the microwave guide connections with aluminized mylar foil. d) Fabrice: move target control computers to the new UTP network.