Minutes from target meeting held October 22 2010 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) From 0.63 T dipole field to 2.5 T solenoid on Sunday morning 8:30. Measure polarizations +76.6 %, -73.3 % and +75.6 %. Monday at 19:00 to transverse dipole field with polarizations -79.7 %, +81.2 % and -79.2 %. Restart polarizing on Tuesday morning 10:30. Wednesday 9:00 -84.8 %, +83.6 % and -84.7 % reached. Go to transverse field for interventions in the experimental area and back to 2.5 T at 17:00. The full 2.5 T field kept until Friday 17:38. Transverse field started after that. The foreseen microwave reversals are planned on October 28 and November 10. b) Jaakko: reconnect power for the cavity pumping line and horizontal screen pipe heating cable. The cable was off since the circuit breaker below platform on Saleve side is sensitive to the stray field from 2.5 T solenoid. c) TTH4, TTH5 and TTH6 scales need to be changed for the polarization build up and back when in frozen spin mode. d) Placement of new diffusion pump control system was discussed. If the PLC substation is put into control room rack it will not be in high radiation area during the future Drell-Yan programme. Radiation sensitivity of all the other electronics on the target platform was discussed. e) Yuri: good stability of the microwave generators during polarization build up. Good balance between upstream and downstream cells. Slower build up time due to old target material. Microwave stopper may have some leakage. New microwave cavity for Drell-Yan planned. Microwave feeding needs to be done carefully.