Minutes from target meeting held January 22 2010 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Jura side helium pipes from platform were reinstalled. The magnet quench line is now higher allowing more free access to the Jura side footbridge. The helium-4 pumping line and recovery line were also re-welded in the pump room. The new helium-4 pump group was installed in place on January 14. The electrical wiring to the control cabinet is going on. b) Estimate of radiation length for 2007 target http://wwwcompass.cern.ch/elog/target_polar/80 c) Yuri: replace EIO cooling water tubes, test cooling system and install wave guides to the platform. Check the microwave power going to the platform. d) Kaori: PXI crate arrived on Tuesday with controller already in the chassis. Operating system in PXI 9.0 and NMR PC upgraded to LabVIEW 9. Crate accessible with ethernet. Magnetic shielding probably needed. e) Workshop on world helium-3 supply February 11 http://helium3.aaas.org