Minutes from target meeting held October 15 2010 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Pump room air conditioning unit stopped on Tuesday morning 0:15. TCR called to switch back the circuit breakers on the roof of the pump room. Friday morning 1:50 air conditioning unit stopped again. Restart with help of TCR. During the day clean the air inlet. Yuri: fill water to the NMR-cable water cooling unit. b) Norihiro reported on the EU framework polarized target meeting held at Dubrovnik Croatia October 10 - 12. c) Fabrice: work on the helium pump water cooling circuit is planned. d) Jaakko: analyse different polarization build up periods from 2007 and 2010 to see how long it takes to reach certain polarization value. The build up seems to be a little faster in 2007 than 2010. Microwave feeding was modified and an attenuator was added to the upstream cell feedthrough in 2010. Density of the paramagnetic centers may have changed and the target material cooling in helium-3/4 mixture might be different in 2010 compared to 2007. See http://wwwcompass.cern.ch/elog/target_polar/98