Minutes from target meeting held July 8 2010 in 888 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Solenoid and dipole current reading for the COMPASS DCS was discussed. In 2004 the Danfysik Ultrastab 860R solenoid current transducer output on the rear panel was cabled to the DCS ELMB on the Saleve side of the target platform. A high common-mode operational amplifier AD629 was used to measure the voltage from the dipole 0.75 mohm series shunt resistor. The amplifier output was connected to the same ELMB. See http://wwwcompass.cern.ch/twiki/bin/view/PolarizedTarget/PolTargMagnCur Fabrice: solenoid and dipole current values are available from the run logbook MySQL database. b) Norihiro: enhance polarization on Friday 14:00 - 21:00. Microwave reversal started Monday 18:00. Tuesday 19:00 polarizations +76.9%, -76.2% and +78.4% reached. Enhance polarization on Thursday 09:00 - 16:00 to +79.8%, -78.2% and +80.6%. c) Norihiro: change LN2 trap filling parameters in the PLC. Warning about empty LN2 dewar now only after 55 fillings. d) Yuri: faster destroying of polarization with microwaves and low 4 V still heater. High polarization lost in about 40 minutes. e) The long SPS machine development scheduled on July 19 - 24 was discussed. f) Kaori: target polarization can now be monitored in transverse field. g) Jaakko: communication with Picowatt on the AVS-47 warming up the other target holder thermometers. Some possibilities (Reijo): current due to DC-offset, broken and oscillating preamplifier, additional ground loop due to AVS-47 or some modification done to the AVS-47. Needs to be investigated during a suitable technical stop.