Minutes from target meeting held March 3 2010 in 892-2-009 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2010/ a) Disassemble target holder and test SMA feed-through #7 separately. No leak found. Assemble target holder and leak test again. The same leak still present. Disassemble target holder again and leak test SMA feed-through #8. Leak seems to be through the epoxy glue or soldering inside the feed-through #8. b) Kaori: test NMR coils with a pulser. Mounting shelve for PXI crate in preparation. c) Werner: extra ammonia stored at CERN about 200 ccm. Still additional 200 ccm at Bochum. d) Brief discussion on target shifts.