Minutes from target meeting held March 28 2008 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2008/ a) Yuri: test new EIO tube. More than 10 W power output. Kaori: cathode voltage setting password protected. b) Four TUM cold silicon station installation and commissioning were discussed. Also operation of the liquid hydrogen target in run 2008 was discussed.