Minutes from target meeting held October 10 2008 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2008/ a) Fabrice: offer for new Leybold 2000 m^3/h roots and rotary vacuum pump system modified for helium about 60 kCHF. Leak tightness better than 10^-6 mbar l/s. b) Norihiro: full length 120 cm target will probably be used in the Drell-Yan program. c) Jaakko: plot helium-3 and proton signals in frozen spin mode September 27 2001 from 6LiD target. Helium-3 polarization close to zero. See http://wwwcompass.cern.ch/elog/target_polar/66