Minutes from target meeting held October 26 2007 in 892-1-D20 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2007/ a) Wednesday October 24 longitudinal field 2.5 T. Polarizations +89.2%, -78.3% and +82.4%. Thursday 10:55 roots #13 gas outlet heat exchanger thermal switch failure, only three pumps running. Target warmed close to 1 K and polarization lost. The thermal switch bridged and roots pump system restarted. Restart polarization. Friday at 10:00 -72.3%, 77.5% and -73.2% reached. At 10:46 start transverse data taking.