Minutes from target meeting held August 9 2007 in 888 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2007/ a) Transverse data taking was started on August 2 13:00 with polarizations -83.2 %, +81.9 % and -75.0 %. On Monday August 6 back to longitudinal 2.5 T field with polarizations -81.3 %, +80.1 % and -71.9 %. Restart polarization. Tuesday at 12:00 first field rotation from +650 A to -650 A. PLC CPU failure at 15:15, only the vacuum diffusion pump affected. On Wednesday attempt to replace the CPU with new unit, but unfortunately the old memory card is not compatible with the new CPU. On Thursday polarizations -95.2 %, +88.6 % and -85.7 %, start frozen spin mode and 17:30 go to -260 A solenoid current (1.0 T). On Friday 11:00 first field rotation in 1.0 T field. b) Jaakko: using the the May 2 TE-calibration the polarization loss rate in 0.63 T transverse field 0.27 - 0.35 %/d upstream, 0.21 - 0.58 %/d middle and 0.47 - 0.61 %/d downstream in different periods. c) Miroslav reported on Spin Prague 2007. Norihiro reported on the Circum-Pan-Pacific Symposium on High Energy Spin Physics held in Vancouver. d) Fabrice was calculating magnetic field close to Recoil-Proton-Detector (RPD).