Minutes from target meeting held January 31 2006 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2006/ a) 3rd Meeting: Polarized Nucleon Targets for Europe in the 6th European Framework Program took place February 2 - 4 in Rech. See http://www.ep1.ruhr-uni-bochum.de/poltarg/Rech/index.html b) The magnet was filled with LHe. Field mapping system was installed inside the warm bore tube. c) Kaori: NMR rack was bolted to the platform. The Q-meter boxes were moved to the clean area. Offer for spare preamplifier A71 from Macom was received. d) About 450 shifts and 21 target week coordinations are expected for the physics run from June 14 to November 6. For the preparation phase about 70 shifts and 3 week coordinations. The technical run with NH3 or 6LiD adds about same amount of shifts.