Minutes from target meeting held February 23 2006 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2006/ a) Vadim requested material budget in terms of radiation length for the new target system in 0 and 180 mrad scattering angles. b) Dilution cryostat was closed with test vacuum flange and tube without the glass fiber mixing chamber. The microwave feed throughs were closed with blind flanges. No leaks from 3He or 4He circuits to isolation vacuum were observed and no leaks in the outer vacuum case from outside. Also target holder and precooling plug vacuum were leak tested. c) Target cells from run 2004 were removed from the target holder Kevlar tube. Inserting of the shorter target holder for new magnet was tested in the clean area. The two target cell system for conical cavity with deuteron NMR coils is ready if it is needed in the technical run before physics data taking. d) Alain: 2.5 T field map of the magnet was done and interaction with SM1 was tested. Solenoid moves 1.5 mm up or down at downstream end depending on the sign of the current. At upstream end the movement is 0.5 mm up or down. e) Davide was preparing LH2 target. To be tested in September/October. f) Offer for new AVS47A resistance bridge for thermometers EUR 4125 with IEEE-488 Computer Interface EUR 1250.