Minutes from target meeting held March 8 2006 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2006/ a) The 3He roots blowers and 4He pumping system were restarted. Small problems with cooling water interlock, motor cooling fan and thermal interlock. b) The magnet movement due to cooling down to liquid helium temperature and stress from magnetic interaction with SM1 was dicussed.