Minutes from target meeting held September 22 2005 in 892-1-B09 These minutes are available also from: http://wwwcompass.cern.ch/compass/detector/target/Minutes/2005/ a) LHe filling of the new superconducting magnet was started on September 22 at Saclay. b) Fabrice calculated magnet field at different pump locations: - rotary pump Alcatel 2033: at center of magnet, -280 cm below beam axis B=55 G - turbo on DR side: 140 cm upstream of center, 40 cm to Saleve and 90 cm above beam axis B=820 G - turbo on DR bottom: 140 cm upstream of magnet center, 65 cm below beam axis B=1700 G