Minutes from target meeting held June 3 2004 in 888 a) The polarization loss in frozen spin mode was recovered by re-polarizing from Tuesday 23:20 to Thursday 2:00. The polarization increased from +54.73 % to +55.53 % for upstream and from -48.07 % to -48.62 % for downstream. b) There is no beam from June 8 8:00 to June 14 8:00 and from June 21 8:00 to June 26 8:00. The physics data taking restarts from the morning of June 26. Between June 14 and June 21 there is a 25 ns run. The preparation of a second TE-calibration will be started from the Tuesday morning June 8. After one week the operation of the dilution cryostat is recovered and the IMPATT diode microwave source is tested for polarization. During the last week without beam June 21 - 26 the target is re-polarized to the maximum.