Minutes from weekly target meeting held 13th of November 2001 in 888 a) TE-calibration finished by 18:00 on Tuesday 13th of November, calibration done for D, 6Li, 7Li and p at temperatures 1.44 K and 0.94 K. b) Start to take EPR-lines with IMPATT-diode microwave source after 18:00 on Tuesday. c) During the collaboration meeting SMC magnet is off and small circulation is maintained to keep the cryostat cold. No night shifts are required for this period. d) Warming up of the target can start after the collaboration meeting unless there is need for additional measurements. In principle we could use next week for such measurements. Otherwise we can start unloading of the material at the end of next week. e) For unloading of target material warming up of the mixing chamber up to 100 K is needed. This can easily take several days. For storage of the target holder we prepare one bath with LN2. An other bath of liquid argon is prepared for removing the target material from the target cassettes. d) Naoki will give a rehearsal talk of his collaboration talk in the target meeting on Wednesday at 18:30.